Front Entryway in Bradford, NH
This project required addressing the old stone retaining wall, wooden steps, as well as a drainage problem. Demolition included disposing of the wooden steps, removing the old stone retaining wall, and installing drainage pipe and stone. Once that was installed, we built a new stone retaining wall, adding in a set of Swenson granite steps, as well as a Cambridge paving stone walkway.
![entryway-7](https://jcbdesignscapes.com/wp-content/uploads/2024/02/entryway-7.jpg)
Project Info:
- Services:
- Location: